Pyromatics Automation Systems of Crystal Lake, IL, was contracted by Durex Industries of Cary, IL, to develop a Life Cycle Test Station for its electric heating elements. After extensive research, Pyromatics chose AutomationDirect as the primary supplier of hardware and software for the project.

Cycle Test Station with Heater

This test station needed a user-friendly graphical interface to give operators the ability to select multiple ramp/soak parameters, output voltages, temperature sensor types, amperage ratings and total cycle counts on tests for the cast-in electric heater platens. The system also needed to record temperature, volts, and current draw throughout the test for use in quality reports.

Most important, a failure of the heater being tested required a safe shutdown of the test while alerting the quality department of the alarm condition. If a heater is drawing either too much or too little current, or if the temperature difference between the primary and secondary temperature sensor is too large, the system would stop the ramp/soak cycle and turn off the output to the heater.

Pyromatics selected the cost-effective DirectLOGIC® DL06 PLC as the heart of the system because of its ability to control up to eight PID loops and multiple expansion slots available for thermocouple cards and analog input modules. It also provided the necessary discrete inputs and outputs to control two heaters, two chillers and an array of panel indicators, buttons, switches and relays. Programming the DL06 was a snap, using the DirectSOFT® Ladder Logic Editor.

The C-more EA7-T10C 10-inch TFT touch-screen operator interface was used to provide operators with the necessary interface to operate and monitor the tests.

The challenges of building the control panel were eased with the use of DIN-rail mounted hardware, including the DL06 PLC, terminal blocks, solid state relays, power supply and other components. Wire routing was simplified using T1E Series thin finger wire duct, giving the finished panel a professional look.

The completed system allows users to quickly connect the heater to be tested, enter test parameters, and run the test. Trend charts on the C-more panel provide excellent tools for tracking test parameters and quickly identifying potential issues such as sudden drops in current or temperature.

Alarm reporting and history are also automatically recorded, allowing the operator to determine causes of failure. Data from the test can be easily uploaded to a USB thumb drive from the C-more panel. The data can then be imported into the user’s choice of word processor or spreadsheet.

C-more Operator Interface in Panel

Once the test station was built and delivered, requests for additional analog input requirements were easily met with the extra expansion slots available on the DL06 PLC. Another post-delivery enhancement was the addition of e-mail alerts, sent from the C-more panel to notify personnel of failures and other events. A duplicate system was built to meet the increasing demand for customer-specified life cycle testing.

Future enhancements of the test stations will include post-cycle quality metrics, such as AC hipot testing, which will verify sufficient insulation of the components to protect operators from electrical shock. AC leakage and heater resistance measurements will also be added.

AutomationDirect provided superior sales and service support throughout the project. Phone and email support and online manuals with detailed example connectivity diagrams and ladder logic samples made any programming challenges achievable.

Both systems have been running on a continuous basis for the past year and have completed full accelerated life testing on over 100 heaters. This testing has allowed Durex to design heaters that meet or exceed their customers’ requirements.


View products from AutomationDirect that relate to this article:
DL06 PLCs ׀  C-more HMI Panels 


Bookmark and Share Email

Comment on or read comments on this article

___________________________________________________________________________

Ohio Energy Group Finds Alternative Control

By John Decker

___________________________________________________________________________

I am a member of a small alternative energy group in Ohio. Many of us generate our own power using wind turbines. These wind turbines vary widely from low power to high power and from homemade to high-tech. Among all of this diversity, we had one common problem - we were looking for a new solution to replacing our aging analog wind turbine controls. Not only were the old controls becoming a reliability issue, but replacement parts were becoming more difficult to get, and they were also more expensive. To compound these issues, the local power company had also informed us of impending tighter restrictions regarding safety systems and power distortion (THD) control that our simple analog control systems could not handle for our induction generators.

It became apparent that we had to find a system that could be easily customized to work with a variety of wind turbines and control schemes. With a large investment already made in the turbines and towers, we had to find an upgrade path that was affordable. This seemed simple enough, or so we thought.

After several months of research, we noticed a definite pattern. Available control systems were either way too expensive for the average person, or were proprietary and purpose-built for a specific wind turbine. There was nothing available that met the needs of our installations and budget, let alone a solution that could be adapted to various setups. We began to feel that searching for a new control system was a lost cause.

Then, I ran across the AutomationDirect Web site while looking for a new supplier for some relays that we used in our control system. The DirectLOGIC® PLCs and the C-more Micro panels really caught my eye. Could components this inexpensive really be used to design a replacement control system? I did some research online and I was very impressed with the many rave reviews I found regarding AutomationDirect and their great support. After bringing my findings to some of the others in our group, I was met with a lot of skepticism, but I got their backing to engineer our own control system, and use these affordable components that I had just found from AutomationDirect.

The next problem was finding someone with PLC experience to help us design our new system. Hiring a PLC programmer sounded like a great idea until we got some price quotes. After a few more dead ends, I finally decided I would learn to program in relay ladder logic (RLL) and attempt to design the control program myself. Having done minor computer programming in the past, I felt confident I could give it a try.

I placed an order and purchased enough components to make four complete units. I chose the DirectLOGIC D0-05DR PLC and the 3” C-more Micro panel as the main components. Since we also needed new instruments to measure alternator RPM and wind speed, I ordered HO-CTRIO high speed counter cards and found some suitable pulsing instruments. In fact, every component we used, except for a couple of sensors, was ordered from AutomationDirect.

Winddaddy

While the DL05 and the C-more Micro together were the most expensive components, the combined cost was still much less than some of the individual modules in the old control system.

Maintenance and repair time regarding the PLC also had many advantages. For example, if the new control system became damaged from a lightning strike, it would be easier and less expensive to replace a $99 PLC than to replace several modules priced anywhere from $300-$500 each with the old system. Everything about this approach made a lot of sense.

I took a few weeks to read through the manuals and study up on RLL programming and DirectLOGIC’s RLL Plus. I found the RLL Plus stage concept so easy to understand and the manual so well written, that I drew out the state logic to the entire control program immediately after reading the chapter that very day. I became very interested in PLC programming at that point and joined AutomationDirect’s online technical forums. I was pleasantly surprised with how welcoming and helpful the community there was. It allowed to me ask questions, get answers and share my experiences very easily.

TurbinesOver the next couple of weeks, I worked on turning my state transition diagrams into RLL code. I am still amazed at how easy it was. Even when I was stumped, the online community was right there to help. Early on in the programming process, I realized that I had a lot of unused inputs and outputs, so I switched strategies and became determined to make each of our PLC-based control systems control two wind turbines. If this worked, it would cut costs per wind turbine in half for many installations.

After about three weeks, I had a very workable prototype. Keep in mind that I had never even seen or heard of RLL just a month prior to this! I took some time to do some bench-top testing. In my case, bench-top testing actually took place on my kitchen table. I don’t have a development lab – I am just an average guy that took an opportunity to try something new. After a week or so of testing everything I could think of, I took some time to find bottlenecks in the code, clean up the user interface, and add some “bells and whistles,” such as trending, test screens, and engineering screens that we couldn’t even find in the most expensive control systems we had priced earlier.

Just a couple of short months after starting the project, we were installing the first unit on a pair of 40 KW wind turbines. Representatives from the electric company were there to run their battery of tests. We were all blown away when our new unit outperformed all of our old control systems by an enormous margin, and even met all requirements of the stricter regulations that were going to be instated in the future. The total cost of the new units came out to be less than half of the cost of our older analog controls, and it performed much better. Before we knew it, we had a total of seven wind turbines running off of the four original prototype units. There is still a lot of talk about how much better and more efficiently these new units perform!

Recently I was approached by a company that builds and installs wind turbines. They explained that they had been looking for just this sort of control system for their business. Shortly thereafter, I signed a contract with them; our creation, the “Winddaddy 213” will be used on all of their new installs, and they will offer it as an upgrade to their existing customers. This encompasses over 70 wind turbines! Their first orders have already been placed and units delivered. They are also talking about sponsoring me to design an upgraded version that will control even more turbines simultaneously and offer even more advanced features.

Looking back at this experience and looking at the finished product, I am still amazed at how this all unfolded. What started out as a basic need for us, turned into something much bigger. I now have a control system I understand fully. I can make changes and improvements as needed. I feel empowered that we don’t have to wait on a supplier or manufacturer when we need parts. We know how it operates and we know how to fix things should something go wrong. I would encourage anyone facing a similar situation to take the same road we did. We have gained so much from this experience and still can’t find a single negative to our decision.


View products from AutomationDirect that relate to this article:
DL05 PLCs ׀  C-more Micro Panels 


Comment on or read comments on this article

Bookmark and Share Email

__________________________________________________________________
Links to the current issue of Automation Notebook are found below.
Click the Back Issues link to visit the archives.




www.automationdirect.com

Contact the WEBMASTER

© 2004-2012 AutomationDirect Incorporated / All Rights Reserved No part of this publication shall be copied, reproduced, or transmitted in any way without the prior, written consent of AutomationDirect. AutomationDirect retains the exclusive rights to all information included in this document.